City of Stirling Buildings Asset Managment Plan 2018 - 2028
The City’s community levels of service are detailed in Table 3.4. Its objective is to provide safe, quality, reliable, cost effective, efficient and compliant buildings.
Expected position in 10 years based on the current budget
Performance measure used
Expectation
Current performance
Community levels of service
Quality
>90% of major buildings have a condition rating between 1 and 3
Well-maintained building services
Building condition rating
>90% of major buildings have a condition rating between 1 and 3
Confidence level
High
High
<5 injuries per annum Nil deaths or permanent disablement
Safe building
Number of injuries attributable to building condition
<5 injuries per annum Nil deaths or permanent disablement
Confidence level
High
High
Function
Building assets meet community needs
The City’s annual customer satisfaction survey
A minimum performance score of 7
A minimum performance score of 7
Confidence level
High
High
80% of major buildings have a functionality condition rating between 1 and 3
Functionality condition rating
80% of major buildings have a functionality
The building’s ability to deliver the outcomes intended for the service operating from it
condition rating between 1 and 3
Confidence level
Medium
High
Capacity and use
80% of major buildings have a capacity rating between 1 and 3
Buildings are well utilised
Capacity condition rating
80% of major buildings have a capacity rating between 1 and 3
Confidence level
Medium
High
Table 3.4 Community level of service
Buildings Asset Management Plan 2018 – 2028 | 23
Made with FlippingBook Online newsletter