City of Stirling Corporate Business Plan
OUR BUILT ENVIRONMENT
Objective: Connect the community through sustainable and integrated transport networks A well-connected City is a successful City – socially, environmentally and economically. As well as providing safe and accessible roads and parking, the City will have a network of cycleways and pathways to encourage residents and visitors to travel in more active and healthy ways. There will be a range of options for mobility, with improved public transport and integrated networks to enhance amenity and activity in local centres.
Projects
2022/23
2023/24
2024/25
2025/26
Local Planning Scheme No. 4
An accessible and connected City
To prepare a new Local Planning Scheme No. 4 to meet the City’s statutory obligations
Q1 Workshop with DPLH Q2 Scope submitted to Council for approval Q3 Q4 Report to Council for approval to advertise draft Local Planning Scheme No. 4
2022/23 budget allocation to the project
$120,000
2022/23
2023/24
2024/25
2025/26
Scarborough Beach Redevelopment Area Normalisation This study will identify the necessary infrastructure required for the area east of the West Coast Highway and how it will be funded
Strategy: How will we get there? • Provide and maintain safe, accessible roads and parking • Provide a safe network of cycleways and pathways to link people and places • Advocate for improved public transport options to enhance activity and reduce reliance on vehicle use.
Key informing frameworks and plans • Integrated Transport Strategy • Integrated Cycling Strategy • Rights of Way Management Strategy • Transport Asset Management Plan.
Q1 Consultant appointed Q2 Q3 Report on funding model finalised Q4 Report endorsed by the Executive Team
2022/23 budget allocation to the project
$100,000
2022/23
2023/24
2024/25
2025/26
Stirling City Centre – Osborne Park Precinct Plan To deliver a local development plan that will identify built form guidelines, new road connections and community infrastructure
Services Main Services Construction Services
Q1 Consultant appointed Q2 Q3 Final report on the infrastructure strategy completed Q4 Internal communication completed
Sub-services
FTE 2022/23 net service cost
40.00
$3,345,184
Construction – roads, drainage, bus shelters, lighting, pathways etc. Cadastral surveys Roadworks traffic management
2022/23 budget allocation to the project
$25,000
10.50
$265,957
Design Services Road design
Rights of Way design Traffic management design Drainage design
Subdivision and development control On-street and off-street parking design Traffic and transport planning Road safety Paths – footpaths and cycleways Street lighting Underground power Cycle networks Bus shelters
7.60
$5,322,582
Transport Services
CORPORATE BUSINESS PLAN 2022–2026 | City of Stirling