City of Stirling Corporate Business Plan
Outcome B2: Accessible and connected City Objective What the City aims to achieve
Strategy How will we get there?
B2.1
Connect the community through integrated transport and networks
B2.1.1 Provide and maintain safe, accessible roads, parking, cycleways and pathways B2.1.2 Advocate for improved public transport options to enhance activity
Outcome B2: Projects Doubleview Commercial Centre – deferred until 2019/20
2018/19
2019/20
2020/21
2021/22
2018/19
2019/20
2020/21
2021/22
Bike Route Development Plan – deferred until 2019/20
Outcome B2: Services Service
Sub-services
FTE
Quality measure
Engineering Design
• Road network design • Rights of way design • Drainage design • Traffic management design • Road safety • Pathways and cycle network design • Street lighting design • Parking control
21.10
• % of design program completed to schedule • % of road safety programmes delivered on schedule
Transport Infrastructure Construction
• Construction • Roadworks traffic management
40.10
• % of scheduled Transport Infrastructure Engineering Capital Works Program