Critical risks are those assessed with ‘extreme’ (requiring immediate corrective action) and ‘high’ (requiring corrective action) risk ratings identified in the Infrastructure Risk Management Plan. The residual risk and treatment cost after the selected treatment plan is implemented is shown in the following Table 6.2. These risks are reported to management and Council.
Risk rating (high, extreme)
Service or asset at risk What can happen
Residual risk *
Risk treatment plan
Parks bridges Bridge collapse
High
Annual inspection Level 2 condition audit every seven years Full defect inspections carried out every six months Fortnightly operational inspection process and reporting in place Defect inspections carried out every six months, fortnightly operational inspection process (no compliance checked) Annual inspection (no structural check) Structural inspections to be considered Inspection program of the pathway network in line with the pathways remedial works programs 4-year scheduled condition audits Barbeques, beach showers and drinking fountains are services and inspected weekly Bins are emptied and checked weekly Planning for condition audit of parks furniture assets in 2018/19 Electrical compliance for barbeques to be planned Every two years inspection via qualified builder (to be formalised)
Low
Medium
Playground equipment
Personal injury due to playground equipment failure
High
Playground site Failure of rubber soft fall correctly performing intent
High
Medium
Shade sails
Structural failure due to condition Pedestrians and cyclists tripping while using the pathway network due to trip hazards
High
Medium
Low
High
Parks pathways
Medium
Parks furniture Furniture failure causing personal injury
High
Park shelters
Structural failure causing personal injury
High
Low
Sports infrastructure
Structural failure due to condition Structural failure due to condition
High
At a minimum, fortnightly inspections
Low
Medium (note – without structural
Lighting
High
Annual inspection (no structural check) Annual maintenance checks for lamps and general operation takes place prior to each winter season (no structural) Structural inspection and electrical compliance for assets to be planned
checks, lighting towers have fallen over previously)
Fences, walls and barriers
Structural failure due to condition
High
Condition audit data is five years old Another condition audit to be planned
Low
Table 6.2 Critical risks and treatment plans
*Note The residual risk is the risk remaining after the selected risk treatment plan is operational. The risk assessment process compares the likelihood of a risk event occurring against the consequences of the event occurring. In the risk rating table below, a risk event with a likelihood of ‘possible’ and a consequence of ‘major’ has a risk rating of ‘high’.