City of Stirling Transport Asset Managment Plan

The City’s current service levels are detailed as follows:

Key performance measure

Performance measurement process

Level of service

Performance target

Current performance

Community levels of service

Quality and function

7.6 average perceived performance on Provision of Roads 7.2 average perceived performance on provision of pathways 6.9 average perceived performance on provision of cycle ways

7.0 average perceived performance on provision of roads 7.0 average perceived performance on provision of pathways 7.0 average perceived performance on provision of cycle ways In alignment with corporate KPI >80% of all requests adequately responded to within target for asset and request type

Transport assets meet community needs

City of Stirling’s annual customer research in provision of roads and provision of pedestrian ways

Responsiveness

>80%

Response time to customer requests

Time taken to close road and pathways related requests

Safety

<24

12

Number of injuries and

Transport assets are safe to residents and users

damage claims attributable to transport assets condition

Technical levels of service

Quality

Condition of road network known

Condition survey Whole-of-network

Entire survey completed once every five years Survey due 2018

survey completed once every 5 years

Quality

Pathways: 0.01%. Roads: 4.48%

Assets renewed before the end of their useful life

Condition of road seal surface

Percentage of assets outside intervention level is less than 5% of total length

Function

All gifted assets meet construction specifications

All gifted assets meet construction specifications

Minimum widths as part of design and construction specifications Value of maintenance undertaken as a percentage of asset value

Adequate road and pathway widths for traffic demands Maintain assets by preventative maintenance Traffic management and Blackspot program to improve high-risk areas

Cost effectiveness

Roads <0.2% of value Pathways <2% of value

Roads 0.002% Paths 1.3%

Safety

Treatments completed

>10 projects per year

13 in 2017/18 FY

Table 3.2 Current levels of service